Solar Services
Complete solar solutions — consultancy, installation, PM Surya Ghar Yojana subsidy, solar finance, and business opportunities. Powering Rajasthan with clean, affordable solar energy.
Complete Solar Solutions Under One Roof
From initial consultation to installation, government subsidy to solar financing — SubhNex handles your entire solar journey. Click any service card for full details.
India's largest rooftop solar scheme — every household can install solar panels and get up to 300 units of FREE electricity every month. Central government provides direct subsidy up to ₹78,000. SubhNex handles the complete process from application to installation to subsidy disbursement.
1 kW System
2 kW System
3 kW+ System
Eligibility & Documents
Any Indian household with electricity connection can apply. SubhNex verifies your eligibility and prepares all documents.
Documents Required
Estimate Your Solar Savings
Get an instant estimate of how much you can save with solar installation. Actual savings may vary based on site conditions.
Enter Your Details
Fill in your current electricity usage to see estimated savings from a solar system.
How SubhNex Installs Your Solar System
A streamlined 6-step process from enquiry to power generation — SubhNex handles every step.
Free Site Survey & Consultation
Our solar engineer visits your site — assesses rooftop condition, sunlight hours, shadow analysis, and electrical load. We recommend the right system size and technology.
Day 1Proposal & System Design
Detailed system design with panel layout, inverter selection, wiring diagram and financial proposal including ROI calculation and payback period analysis.
Day 2-3Subsidy Application & DISCOM Approval
We register on PM Surya Ghar portal, submit your DISCOM feasibility application and get the sanction letter — handling all bureaucratic processes for you.
Day 4-15Solar Loan Processing (if required)
We apply for solar loan at subsidized rates from partner banks. Fast approval with minimal documentation — EMI structured to be less than current electricity bill.
Day 7-14Installation & Commissioning
Professional installation team installs panels, inverter, mounting structures and electrical connections. System tested and commissioned within 1-2 days.
Day 20-25Net Meter & Subsidy Disbursement
Net meter installed by DISCOM. Subsidy amount credited directly to your bank account within 30 days of commissioning. You start saving from day one.
Day 30-45